Treasury allocation · 1,284.6 ETH
rebalanced per epoch · floor reserve never draws downNAV floor reserve
46%591 ETH
backs per-token floors, ratchets only up
EDEN index
26%334 ETH
tokenized AI equities, vol-curve deployed
Grants program
13%167 ETH
bi-monthly awards to consistent scorers
Liquid reserves
15%193 ETH
USDC · buybacks + operations
ROOT · governance token
ROOT/ETH pool · RootFeeHook
ROOT pool fee — (RootFeeHook not deployed on this chain)
Uniswap v4 hook fee on every ROOT/ETH swap, 100 % to Eden revenue. Eden Safe can set 1 %–3 % (hard bounds in code). Native LP fee 0; genesis liquidity locked permanently.
ROOT supply
ROOT supply — minter unknown (RootToken not deployed)
Genesis minted 1,000,000,000 ROOT once and renounced the minter in the same transaction batch — nobody can ever mint more (LAUNCH_NUMBERS 7.12). ROOT is outside the launchpad economics — no curve, score, validators or fee lanes. Burns only reduce supply.
NAV floor per token · e130 → e142
+6.1% epoch-over-epochfloor ratchets up only — attested every other epoch alongside the score root
Current floor
0.0314
ETH / token
Since e130
+67%
floor growth
Floor coverage
1.31×
vol-buffered · published e142
Equity sleeve
as-of close
stale price → redemptions pause
Floor discipline
The floor is a design target, not a promise — and it is sized for the day it gets tested. Coverage is computed against a volatility-buffered value of the equity sleeve (never a raw last close over a weekend), index deployment throttles on the index's own vol and drawdown, and while reference prices are stale, AP redemptions pause and floor-adjacent quotes widen. Curve trading never pauses.
Per-project floors
Per-project NAV floors are attested alongside the score root once a curve graduates into fee-sharing. No project floor has been published on this chain yet — floors appear here the epoch they are attested, read on-chain only.
Grant epoch · every 2 months
next: Nov 1, 2026 · in 57dThis cycle's pool
62.4 ETH
from grants allocation
Scoring window
8 epochs
trailing avg + variance
Grants go to the most consistently scored projects — trailing average over 8 epochs, penalized for variance. One good epoch doesn't qualify; eight steady ones do. And the gate is binary: a project must hold approved status at the moment the epoch strikes. Pending or lapsed approval means skipped — no retroactive payouts, next window is in 2 months.
No project has completed the 8-epoch consistency window on this chain yet. Candidates appear here from attested scores only — launch and get scored to qualify.
Shares are computed from the trailing window at epoch time, over approved projects only.
Past grant cycles
No grant cycle has struck on this chain — awards land here the epoch they execute, read from the grants program on-chain.
Grants are the treasury's only discretionary outflow — 13% of the book, replenished by fee inflow each epoch. The floor reserve and index allocations never fund grants.